Neterlands, Zaanstad, Wilhelminasluis, Zaandam, because the current lock has become too small for the current shipping traffic and is ready for major maintenance, it was decided to renew the lock, problems with the first design of the new lock led to major delays in construction.

Neterlands, Zaanstad, Wilhelminasluis, Zaandam, because the current lock has become too small for the current shipping traffi...

Neterlands, Zaanstad, Wilhelminasluis, Zaandam, because the current lock has become too small for the current shipping traffic and is ready for major maintenance, it was decided to renew the lock, problems with the first design of the new lock led to major delays in construction.

Zaanstad, Wilhelminasluis, Zaandam, because the current lock has become too small for the current shipping traffic and is ready for major maintenance, it was decided to renew the lock, problems with the first design of the new lock led to major delays in construction..© 6 aug 2018 Marco van Middelkoop/Aerophoto-Schiphol


Aerial photography library ID: 305000
Created:
Aerial photography library size: 49.2 Mpixels (141 MB uncompressed) - 8098x6073 pixels (27x20.2 in / 68.6x51.4 cm at 300 ppi)
https://d3e1m60ptf1oym.cloudfront.net/78c7fddc-a182-4113-ad4b-2bb4820161cf/305000_xgaplus.jpghttps://www.aerostockphoto.com/licenceshttps://www.aerostockphoto.com/m/-/galleries/aerial-photographs/-/medias/78c7fddc-a182-4113-ad4b-2bb4820161cf/price