IJmuiden, Sluizen complex as seen from the Zuidersluis

IJmuiden, Sluizen complex as seen from the Zuidersluis

IJmuiden, Sluizen complex as seen from the Zuidersluis

IJmuiden, the construction of the new sea lock was completed in the summer of 2021 and will be put into operation in early 2022. The sea lock is 500 metres long, 70 metres wide and 18 metres deep, making it the largest sea lock in the world. (c) 17 July 2021 Aerophoto-Schiphol | aerial photo 307487

Aerial photography library ID: 307487
Created:
Aerial photography library size: 48.1 Mpixels (138 MB uncompressed) - 8012x6009 pixels (26.7x20 in / 67.8x50.9 cm at 300 ppi)
https://di262mgurvkjm.cloudfront.net/1d9bd0ca-9746-4052-8bb8-b7f207c153b0/307487_xgaplus.jpghttps://www.aerostockphoto.com/licenceshttps://www.aerostockphoto.com/m/media/1d9bd0ca-9746-4052-8bb8-b7f207c153b0/price